Bradford Commercial Real Estate: The Industrial Land Opportunity on Highway 400

Most people know Bradford West Gwillimbury as the commuter town at the bottom of Simcoe County, the place you pass on Highway 400 between the Holland Marsh and Barrie. For anyone who builds, leases or owns industrial and commercial real estate, that picture is out of date. In the last six months a new highway started construction, the County approved a rewrite of the Town's Highway 400 employment lands policy, and the Town published a full industrial land strategy.
I'm Darren Cabral, REALTOR® with Cabral Real Estate at CV Real Estate, Brokerage. I work commercial deals across Simcoe County from my base in Barrie, and Bradford's Highway 400 corridor is one I follow closely. Here's what the public record says about the opportunity, who it fits, and what to check before you commit.
The short version
A big, newly updated land base. The Highway 400 Employment Lands cover about 730 hectares (1,804 acres) on both sides of the highway, and the County approved Official Plan Amendment 7 for them on October 6, 2026 (County of Simcoe).
Highway 425 is under construction. Major construction on the Bradford Bypass west section started in May 2026, with completion targeted by 2030 (Ontario).
Costs well below the GTA. The Town's Avison Young strategy puts average industrial occupancy costs at $14.99 per sq ft in Bradford versus $22.67 in GTA North (Avison Young).
Growth is planned, not hoped for. The Town plans for 83,470 people and 30,900 jobs by 2051 (Town of BWG).
The catch is power and servicing. Electricity and water allocation, not zoning maps, decide which projects can move first.

Why Bradford, and why now
Location does most of the work. Bradford sits on Highway 400 at the north edge of York Region, with Toronto Pearson within about 50 kilometres according to the Town's Industrial Land Strategy. Avison Young counts more than 4 million people within a 50 kilometre radius and more than 150 million consumers within a day's drive. For a business that serves both the GTA and Simcoe County, few towns sit closer to the middle of that map.
The town is also growing fast. Statistics Canada counted 42,880 residents in the 2021 Census, up 21.4% from 2016. The Town's growth plan forecasts 83,470 people and 30,900 jobs by 2051, and Avison Young notes Bradford is expected to add more than 19,000 jobs, nearly one in four new jobs across Simcoe County. Local jobs grew 29% between 2020 and 2023 alone, according to the same report.
Meanwhile, industrial land in York Region and the inner GTA keeps getting scarcer and more expensive. Avison Young describes Bradford as a logical next stop for businesses that need bigger sites and lower costs but can't leave the 400 corridor.
The infrastructure story

Highway 425, the Bradford Bypass
The Bradford Bypass is a 16.3 kilometre, four-lane freeway that will link Highway 400 in Bradford West Gwillimbury to Highway 404 in East Gwillimbury. On May 14, 2026 the Province announced that major construction had begun and designated the route Highway 425. It says the highway will cut travel times across York Region and Simcoe County by up to 35 minutes.
The west section is the one being built now. It includes a freeway to freeway interchange at Highway 400, interchanges at 10th Sideroad and County Road 4, and a replacement bridge at Highway 400 and Line 9 (MTO project page). The Ministry's April 2026 update targets completion of that section by 2030. The central and east sections are still in detail design with no construction dates yet. I covered the timeline in more detail in my Bradford Bypass post.
Highway 400 widening and GO service
In October 2026 the Province awarded a detail design contract to widen Highway 400 from six to 10 lanes between Highway 9 and the future Bradford Bypass, about 11 kilometres (Ontario Construction News). That's design, not construction, so treat it as a long term improvement. Bradford GO Station is on the Barrie line, and Avison Young notes that GO Expansion plans call for two-way, all-day service as often as every 15 minutes, though no firm delivery date has been confirmed.
Wastewater capacity
The Town broke ground in December 2025 on a tertiary membrane filtration facility at the Bradford Water Pollution Control Plant. It will raise capacity from 19,400 to 23,300 cubic metres a day, a $58.5 million project expected to be operational in 2028 (Town of BWG).
Employment lands and the industrial opportunity

The core of the opportunity is the Highway 400 Employment Lands Secondary Plan: about 730 hectares (1,804 acres) on both sides of Highway 400, generally between Line 5 and Line 9. Town Council adopted Official Plan Amendment 7 on December 2, 2025, and the County of Simcoe approved it on October 6, 2026. Here's what it does, based on the County-approved text:
Extends the planning horizon for these lands to 2051.
Redesignates the former Employment Lands Reserve (Area D) in the north end into Highway 400 Interchange and Highway 400 Industrial/Logistics lands, opening them to a range of employment uses.
Adds a new policy that small and medium sized lots should be reserved for industrial users that don't need a lot of land for truck movements, "in order to diversify employment uses away from logistics and warehousing."
Lists permitted Industrial/Logistics uses as distribution centres, food processing, manufacturing, warehousing, research facilities including laboratories, industrial training facilities, and data centres. Stand-alone offices are not permitted.
Plans the Interchange lands for light industrial, office and employment-supportive uses around the Highway 400 and 88 interchange and the planned Highway 400 and Bradford Bypass interchange.
Keeps residential uses prohibited.
Avison Young's strategy adds useful detail. The Highway 400 Prestige Industrial Business Park alone covers roughly 1,400 acres split across some 60 parcels, and across the Town's main industrial parks the report estimates about 1,100 acres available for development in the short and medium term. Fragmented ownership is a challenge, but it's also where land assembly creates value.
The cost advantage

This is the number that gets developers' attention. In the Avison Young comparison, average gross cost of occupancy in Bradford West Gwillimbury was $14.99 per square foot, against $22.67 in GTA North, $21.85 in Vaughan and $22.01 across the GTA. Vacancy was about 1.8%, in line with GTA North, and the report shows no new industrial supply delivered in Bradford over the prior 12 months. Avison Young also estimates employment land at roughly $485,000 per acre, compared with about $2.5 million in GTA North. The report calls these order-of-magnitude planning figures, so use them as a starting point, not a valuation.
Low vacancy, lower costs and a thin pipeline of new buildings is the kind of gap that new industrial development tends to fill. Whether a specific site works still comes down to approvals, servicing and power.
Who should be looking at Bradford
Industrial developers and builders. Multi-tenant and small-bay industrial, including industrial condos, now have express policy support on smaller and medium lots. Plan on a plan of subdivision or condominium and zoning, not a quick severance.
Owner-users. Manufacturers, food processors, contractors and trades businesses priced out of Vaughan or Concord who want to own their building on the 400 corridor.
Logistics and distribution. Warehousing and distribution are permitted uses, and the Bypass will connect the 400 and 404 corridors. Larger users should confirm truck access during construction and power for automation, refrigeration or EV fleets.
Small businesses and service commercial. Population growth toward 83,470 people supports retail, service and flex space in the urban area and on Interchange lands where permitted.
Investors and land holders. Patient capital looking at assemblies, conditional purchases or options where servicing and power can be documented. The opportunity is long term, not a quick flip.
Landowners. If you own acreage in or near the Highway 400 lands, the policy change is a good reason to get a current read on what your land could be used for and who might want it.
Risks and what to watch
I'd rather you hear the constraints from me now than from your engineer after you've firmed up a deal.
Power is the binding constraint. In August 2026 the Town told the IESO that, in staff's interpretation, Holland Transformer Station is expected to be fully subscribed around 2027 (Town of BWG to IESO). Hydro One's GTA North plan schedules a new Northern York transformer station for 2031. Heavy users, cold storage and data centres should treat power as the first question, not the last. Avison Young notes data centre loads of 50 to 500 megawatts are well beyond Bradford's current grid capacity.
Water and wastewater allocation. Innisfil supplies drinking water to Bradford under a supply agreement that caps maximum-day flow at 19,000 cubic metres per day (InnServices Master Servicing Plan). Designation does not come with servicing allocation.
Designation is not zoning. OPA 7 doesn't rezone land or approve subdivisions. Zoning, draft plan, site plan, environmental review and Ministry of Transportation permits are still needed parcel by parcel.
Appeal finality. The appeal period for OPA 7 closed on November 3, 2026. Confirm with the County that the decision is final before you rely on it.
Construction disruption. Line 9 at Highway 400 is closed for about three years from July 2026 for Bypass work, so check access and detours for any site near the interchange.
Environmental features. Watercourses and Environmental Protection lands run through the corridor, and the Holland Marsh and Lake Simcoe policies apply nearby. Net developable area can be well below gross acreage.
How I can help
Many land and commercial opportunities never hit MLS®. I help buyers match a use, building size and power profile to the right parcel, put together assemblies, and connect landowners with builders and owner-users. If you're a developer, business owner or investor looking at Bradford or anywhere along the 400 corridor in Simcoe County, let's talk about what's available off-market.
Call or text me at 647-371-5335, or email darren@cabralrealestate.ca.
Frequently asked questions
Where are Bradford's main industrial and employment lands?
The largest block is the Highway 400 Employment Lands: about 730 hectares (1,804 acres) on both sides of Highway 400, generally between Line 5 and Line 9, with interchanges at Line 5 and County Road 88 and a planned freeway interchange with the Bradford Bypass. The Town's Avison Young strategy also covers the Artesian Industrial Parkway and Reagens Industrial Park.
What changed with Official Plan Amendment 7?
The County of Simcoe approved OPA 7 on October 6, 2026. It plans the Highway 400 Employment Lands to 2051, redesignates the former Employment Lands Reserve (Area D) for interchange and industrial/logistics uses, and adds a policy supporting small and medium industrial lots. Residential uses remain prohibited. The appeal period closed November 3, 2026.
When will the Bradford Bypass (Highway 425) open?
Only the west section, from Highway 400 to east of County Road 4, has a published target: completion by 2030. The central and east sections are in detail design, and no construction dates have been announced for them.
Is industrial space cheaper in Bradford than in the GTA?
According to the Town's 2026 Industrial Land Strategy by Avison Young, average gross cost of occupancy in Bradford West Gwillimbury was $14.99 per square foot, compared with $22.67 in GTA North and $21.85 in Vaughan, with vacancy around 1.8%. The same report estimates employment land at roughly $485,000 per acre versus $2.5 million in GTA North. These are order-of-magnitude figures, not appraisals.
Can I build on Bradford employment land right away?
Usually not. An Official Plan designation is not zoning, a plan of subdivision, site plan approval, servicing allocation or a power connection. Each parcel still needs those approvals, and electricity capacity is a real constraint for larger users until new transmission capacity arrives, which Hydro One plans for 2031.
Next steps
Bradford Bypass (Highway 425): what it means for Bradford real estate
Off-Market Deals: commercial and investment opportunities before they hit MLS®
Investor Guide: how I look at investment property in Simcoe County
Simcoe County Market Update, October 2026: the latest town by town numbers
General information only, not legal, planning, tax or investment advice, and not a guarantee of value, approvals, servicing or returns. Verify all details with the Town, the County, utilities and your own advisors before acting. Sources: County of Simcoe (CCW 2026-257 Schedule 3C and Notice of Decision, October 2026), Town of Bradford West Gwillimbury (Growth Management Plan to 2051 page, December 2, 2025 news release, August 2026 IESO feedback), Avison Young, Town of BWG Industrial Land Strategy (2026), Statistics Canada 2021 Census, Province of Ontario (May 14, 2026), Ministry of Transportation Bradford Bypass project site and April 2026 municipal update, Hydro One GTA North Regional Infrastructure Plan (May 2026), InnServices Master Servicing Plan (December 2024). Darren Cabral, REALTOR®, CV Real Estate, Brokerage.




Comments